Tender Description
The mechanical system at Beenleigh Community Health Centre has reached end of life (23 years) and is unable to provide a reliable and consistent heating and cooling for the facility. A plant failure event is highly likely in the near future. The external condenser units show significant sign of deterioration due to age, rust, corrosion and long-term use. This deterioration affects the capacity for the system, reliability and effectiveness.
In addition to age, the internal insulation creates infection control concerns within the system and does not comply to the most recent standards required within a health care facility namely, AS3666 Air Handling and Water Systems and the Queensland Health Capital Infrastructure Guidelines.
The Oral Health Clinic that operates within the Beenleigh Community Health Centre must comply with AS/NZS4187:2014 by December 2021.
Trades Involved
Architectural
Services
- Fire Services
- Mechanical Services
Structural
- Bricklaying / Blocklaying
- Concreting