Tender Description
Stage 1
• Library refurbishment works;
• Conversion of existing Boys’ Toilets (currently used as a Storeroom) in to a Girl’s Toilet block;
• Site services reconfiguration and all associated works to infrastructure
Stage 2
• Removal of asbestos in substrate materials in Building 43;
• Demolition of the East side of the existing Building 43 Block
• Removal of asbestos in subfloor Building 43.
Stage 3
• Removal of any asbestos known and not identified in the demolition of buildings in the East site campus except for those buildings being retained;
• Demolition of all buildings on the East Campus, except the retention of Building 1, Building 3, part of Building 4, Building 9 & Building 8.
• Building 1 is being retained as it will be used as Food Technology during the CW construction period.
• Building 3 is being retained due to the infrastructure to retain servicing to the East campus buildings.
• Part of Building 4 is being retained due to the infrastructure to retain servicing to the East campus buildings.
• Buildings 9 & 8 are being retained due to heritage significance and potential
- Retention of roadways and infrastructure network, with capping off of infrastructure and services only so as to retain services and infrastructure operability back to the West Campus;
Trades Involved
Architectural
Preliminaries
- Asbestos Removal
- Demolition
Services
- Electrical
- Hydraulics
- Mechanical
Structural
- Bricklaying
- Carpentry
- Concrete
- Structural Steel